“IMISHLI” REN: RECONSTRUCTION WORK IS CONTINUED
Reconstruction work was implemented at all s/s, transformer points, by the way, at complete transformers points and TL located at the territory of “Imishli Electric Network”, as at all energy objects.
According to the information given by “Imishli” REN to the Press – release of “Azerenergy” JSC, extensive information was given about carried out measures at “Sabirabad” and “Zardab” electric networks belonging to REN balance.
Lets` noted that, energy supply of “Sabirabad” EN is supported with 74 TL by 10 – 6 kV, 1417 transformers by 10 (6) 0,4 kV total power by 245,4 MVA.
Different setting repair work were implemented at about 5 km distance of OHL by 10 kV coming out of Sabirabad s/s by 110 kV, Javad, Sarkhanbeyli, Vidadi – 2, Heshimkhanli and Kurekendi s/s by 35 kV during the I quarter of the current year.
Carried out reconstruction work at TL by 0,4 kV is also included to repair work. So that, totally about 6 km distance was maintenance and capital repaired under TL by 0,4 kV at Memishler, Galaghayin, Javad, Narlig, Hesenkend, Shehriyar, Surra, Heshimkhanli, Guzma, Zengene, Akhtachi, Sarakhanbeyli, Kovlar, Garaguney, Garatoghay, Ulajali villages and Sabirabad city. Repair work of the transformer by 10/0,4 kV under the network is one of this type measures. According to the information given by the source, more than 40 different powered transformers were capital or maintenance repaired.
Relevant measures were successfully implemented at Zardab EN belonging to REN balance. Lets` also noted that, energy supply of EN is supported with 24 TL by 10 kV and 476 transformers by 10/0,4 kV total power by 60 MVA. Repair work was also implemented at OHL by 10 kV coming out of Zardab, Seyidliler and Melikli s/s by 35 kV. Lets` noted that, repair – restoration work was operated at about 3 km distance.
Lets` also noted that, capital and maintenance repair work was implemented at about 3 km part of TL by 0,4 kV located at Aljanli, Gerevelli, Pervanli, Challi, Gelme, Elvend, Lek, Shihbaghi, Beyimli, Sheftehal, Aghmalilar, Mehtililer, Memmedgasimli villages and Zerdab city. More than 20 different powered transformers were repaid and put into normal work regime.
Lets` noted that, traditionally repair – restoration work were continued and concrete steps were taken in the line of them.