TECHNICAL ECONOMICAL INDICATORS ARE SATISFACTORY
According to the information given by “Azerbaijan Thermal Power Plant” (TPP) which is the flagman of energy system of the state to the Press – release of “Azerenergy” JSC, the collective were spent 11 months of the year with efficiently humor. By the way, the indicators of November are satisfactory. More than 708,9 million kWh electric energy was produced at the power plant in November of the current year. About 6 milliard 913,3 million kWh electric energy was generated during 11 months of the current year.
Incidentally, various preventive measures implemented as a result of the increased level of maintenance of equipment, and other technical and economic indicators power has the ability to acquire some achievements. Currently, the plant continues to operate in accordance with the dispatch schedule.
The source also noted that, as in all areas of the energy system, "TPP" in accordance with the normal operation of the power plant in order to maintain the current situation , including the station in preparation for the winter season , equipment operation , to minimize accidents and number of returns all necessary measures have been carried out in sequence. Thus, during the last three months of the current year on the basis of two units, while each of the other units have been renovated. Also be noted that the system control unit number 5 overhaul and other equipment, began the reconstruction .
During the reporting period 500 kV substation was repaired three key figures in the air. At the same time , 330 and 500 kV , and drainage systems have been installed in the manifold . All of them , number 2 , respectively, in connection with the construction of the tunnel was in progress. At the same time, the reconstruction unit number 5, 500 kV service air circuit breakers , auxiliary production areas, equipment , buildings and structures , repair and maintenance and the number 2 tunnel construction work is underway .
According to information provided fire safety, fire, water lines and pumping stations are in good condition , automatic fire extinguishing system were inspected, cleaned and dry grass and other regulatory measures have been taken.