STABILITY WAS MUCH MORE INCREASED
Supplying of front residents with quality and without break electric energy is one the main orders today. Stability of energy supply at the territories where cease-fire is often disordered is in the center of the attention. Collective of “Fizuli Electric Network” are properly carried out this mission.
According to the information given by the mentioned enterprise to the Press – release of “Azerenergy” JSC, carrying out of exploitation work in high level at new constructed settlements are also in the center of the attention. Seasonal measures are implemented in time and with quality. Maintenance repair work was operated at s/s by 35/10 kV in the line of preparation to autumn – winter season. By the way, all transformer points are controlled and necessary measures were executed at these objects.
Struggle measures in the line of preventing of illegal use of electric power is gain dynamical character. Relevant statements were drawn up against them.
Lets` noted at the end that, metering process is mainly finished and at present, energy supply of Horadiz is organized in high level. The territory of the city was totally cabled.