WE MEET AUTUMN WITH GOOD PREPARATION
We are looking through measures carried out at exploitation area of Aghdash region belonging to “Mingachevir” REN during last months. According to the information given by “Aghdash Electric Network” to the Press – release of “Azerenergy” JSC, intended measures are systematically implemented in the line of increasing of stability of energy transmission, rising of quality during last months. New meters were constructed for more than 230 private subscribers, more than 290 damaged meters were substituted. 3,5 km of the lines of “Dehne”, “Kulek”, “Shixli”, the I “Sheher” and “Gushchulug” TL by 10 kV. Lets` noted that, analogical measures was operated at the line by 0,4 kV. About 14 km distance of the lines by 0,4 kV was capital repaired at Haydar Aliyev avenue, H. Hajiyev, Istiglal, I. Milletoghlu, M. Isayev streets of the region center and Uchgovag, Pireyir, Yenikend, Korarax, Shortepe, Bulagotaghi villages. Maintenance repair work was operated at TL by 10 and 0,4 kV.
By the way, capital and maintenance repair work were operated at the transformer points by 10/0,4 kV by repair brigade of “Aghdash” EN. They capital repaired different powered 22 transformers and maintenance repaired 24 transformers. All this measures were operated in the line of preparation to winter season and naturally will play positive role in paying of energy fees.
.