REPAIR WORK IS IMPLEMENTED

Image

Carrying out of capital and maintenance repair work at the s/s and TL, decreasing of losses in order to supply the  consumers with quality and regular electric power are the main orders standing in front of us. Relevant measures were operated at Ganja Regional Electric Network (REN) as at other energy objects in the line of it. The main system organizing network is in the center of the attention.

According to the information given by mentioned enterprise to the Press – release of Azerenergy” JSC, more than one km distance and about 1000 insulators were substituted with new ones at TL by 35 and more kV during last three months of the current year. Beside all of them, the trees  of TL was cleaned of trees and measures are continued in the line of it.

Under the information given by the source, oil circuit breakers of the I and II “Melichor” TL of “Ganja – 1” s/s by 110 kV, the V and VI Ganja TL were substituted with new one. Different setting repair work were operated at the equipments of other s/s.

Lets` noted that, repair work were operated at Ganja s/s by 330 kV, S.Vurghun, “Yenikend” by 110 kV, “Guneshli” s/s by 35 kV.

By the way, substituting of the breakers by 330 kV of Shaha, Gardabani TL of auto transformer number 2 by 125 MVA is continued at Aghstaga s/s by 330 kV in accordance to reconstruction and repair – restoration work.

In additional, fire safety process is in the center of the attention as at other enterprises. So that, s/s by 110 – 500 kV and TL are systematically controlled, the territory was cleaned of dry grass, oil level was also controlled at all oil capacious equipments.

It should be noted at the end that, large scaled reconstruction work was operated at the networks by 10, 6 and 0,4 kV belonging to Ganja, Samukh, Dashkesen, Shamkir, Tovuz, Aghstafa, gazakh and Gadabay EN during last three months of the current year and these type of measures are continued presently.