“UJAR EN”: REPAIR WORK IS IMPLEMENTED

Image

A lot of repair – restoration work are carried out at the enterprise service territory during current year as always. It was noted in the information given by “Ujar Electric Network” to the Press – release of “Azerenergy” JSC.

Different setting repair work were implemented at 74 transformer points belonging to the balance during last three months of the current yeat. At the same time, two transformers were capital repaired and put into operation.

Lets` noted that, different setting repair work were implemented at TL during last three months of the current year. By the way, totally about 3,6 km distance of the III “Sheher”, “Gushchuluq”, I “Kend”  TL by 10 kV were repaired. At the same time, new 250 meter line was installed and about 1 km part of this lines was repaid in accordance to enlarge of highwat at Melikballi village of “Gazigumlug” TL. New 500 meter line was also installed in accordance to change of trace of TL by 0,4 kV. Beside all of them, different setting repair work were implemented at the lines by 0,4 kV, by the way, about 4,7 km line was repaired.

“Lots of measures are carried out in the line of preventing of violations of rule of electric power” – noted source was also informed about discovered infringements.

As they noted, more than 100 violations of rule of electric power (75 of them belongs to private consumer group) were discovered and the settlements were drawn up against them. As a result of it, about 6175 00 kWh (more than 3285 00 kWh  belongs to private consumer group) energy loss was observed. About 18 % of this sum was repaid as a result of carried out relevant measures.

It should be noted that, 270 violations of rule of electric power (225 of them belongs to private consumer group) were discovered and more than 1003 00 manat use value of 1 million 6727 00 kWh (more than 1 million 1813 00 kWh of them belongs to private consumer group) lossed electric power was restored. More than 37 % of this sum was repaid and relevant measures are implemented in the line of repaying of the remainder sum.