THE POWER PLANT IS OPERATING UNDER THE DISPATCH GRAPHIC
At independence period, the power plant was put into operation under the leadership of the great leader of the Absheron Peninsula, which is the most important for power generation "Shimal" ES-sustainable and efficient operation of the main and auxiliary equipment for an action plan was developed and implemented. As a result, in recent years, as well as technical and economic indicators in January was high. The station operates in accordance with the dispatch schedule.
According to the information given to the Press – release of "Azerenergy" JSC, in January this year at the station 210,7 million kWh of electricity was created.
Note that 1 million last year was 881,7 million kWh of electricity.
It should be noted that last year, and in January of this year to improve the efficiency of power transmission and distribution systems sustainable, stable operation, as a result of targeted measures to improve the quality of electricity and other technical indicators have been achieved.
Source as a logical result of successfully realized he also said that the proposed activities and other arrangements in preparation for the season continues on schedule. In particular, the sea and the natural deposits of silt regularly clean the vent for cooling water channel.
By the way, such as the issue of fire safety in the spotlight. For example, fire safety, fire-fighting pumps are regulated so that the defects are eliminated. At the same time, the situation was brought to the fire alarm systems have been tested. Along with all staff are trained in the accident.
"Shimal" in the ES development program successfully continues today the leadership of the Republic of Azerbaijan. Japan company "Toyo Engineering" under the contract with the construction of the second unit 409 MW allowed. At present, the construction of power 409 MW continues on schedule.