NECESSARY MEASURES ARE CARRIED OUT

Image

Intended measures plan was mainly carried out in order to supply the consumers with quality and stabile electric energy at Kurdamir Electric Network”. At present, repair restoration measures are continued.

According to the information given by the network to the Press – release of “Azerenergy” JSC, more than 40 transformers were capital and maintenance repaired at the network territory during last three months.

Lets` noted that, capital and maintenance repair work  were implemented at about 5,8 km of the line by 10 kV and 3,9 km of the line by 0,4 kV.

Lets` noted that, violations of rule of electric energy of 43 consumers were discovered at the enterprise service territory in January of the current year and about 91 00 manat use value of about 1511 00 kWh loosed electric energy was implemented. Payment of this sum was operated during financial period.

Lets` noted stressing to the source that, 475 violations of rule were discovered during last year. As a result of it, about 2424 00 manat use value of more than 4 million 397 00 kWh loosed electric energy was restored. More than 21 % of this sum was repaid and relevant measures are carried out in the line of paying of remainder sum.

Under other information given by the source,  about 13,7 million kWh electric energy was used under the enterprise in January of the current year. By the  way, about 7,2 million kWh electric energy was used under private consumer group. Payment was about 4 % in comparison with relevant period of last year.